New feature needed

You probably have this on your list for desired features for a future version. The thing I most wish for right now is to be able to right click on an item in the schedule and choose Duplicate. Thanks if this is ever possible.

John

1 Comment

ironically, this was a feature in EW 2009.

I too would like this back as on occasions it would be very useful.

Login to post a comment